
 Nyac Gold Project
Tonopah Divide Gold Project
King Tonopah Gold & Silver Project
Project Pictures



|  |
Nyac Gold Project
83,200 acres in mining friendly jurisdiction
• 57,600 acres leased from Calista Corp
• 25,600 acres staked from State of Alaska
Rock chip samples greater than 1,000 g/t (29 ounces per ton) gold
Drill intercepts to 8.6 g/t (.25 ounces per ton) gold over .6 meters
Over 7,400 soil samples collected, up to 4.2 g/t gold
8,383 feet (2,556 meters) core drilled in 11 holes
Over 600,000 ounces of placer gold produced on property
Excellent infrastructure including:
• two runways, C-130 Hercules capable
• network of maintained roadways
more...
|
Rainbow Gold Project
On trend with Pogo mine (3.6 Million Oz.), 2.5 miles to the east
2,560 acres in Historic Goodpaster Mining District
Quartz veins to 2.4 g/t
more...
|
Tonopah Divide Gold Project
17,000' of reverse circulation drilling
34 patented claims, 124 unpatented claims
3,160 acres in a mining friendly jurisdiction
Resource estimated at 2.9M ounces of gold (Prudden 1993) and up to 2M ounces (Dilles 2006)
District heavily consolidated by Tonopah Divide Mining Company prior to our lease
more...
|
Tonogold Mines Gold Project
Surface samples up to 47.6 grams per ton Gold
22 Samples, all contain Gold, 7 contain greater than 1 g/t
Mineralization similar to Midway (1+ million ounces)
300 acres in a mining friendly jurisdiction
Excellent access on existing roads
more...
|
King Tonopah Gold & Silver Project
Historical Production
• Gold: Average grade 0.3 ounces per ton (10.3 g/t)
• Silver: Average grade 30.0 ounces per ton (103.4 g/t)
One mile north of central Tonopah District (1.8M ounces gold, 174M ounces silver)
Over 27,000' of core and reverse circulation drilling
73 unpatented claims totaling 1,460 acres in a mining friendly jurisdiction
more...
|
|
|
|